e-Report Login
Contact
Careers
Accreditations
Engineering & Environmental Services
Geotechnical Engineering
Design Phase Services
Facility Management Services
Forensic Services
Civil Engineering
Waste Management Facilities
Water Resources
Drone Mapping & Photogrammetry
Environmental Services
Due Diligence
NEPA Compliance
NPDES Permitting and Monitoring
USACE 404/401 Permitting
Site Remediation
Regulatory Compliance Services
Groundwater Modeling & Monitoring
Brownfield Services
Indoor Air Quality
Construction Support Services
General Construction
Construction Quality Assurance
Building Code Special Inspections
Transportation
Materials Consulting
Construction Engineering
Concrete Consulting
Laboratory Services
Geotechnical Laboratories
Analytical Services Laboratories
Industrial Minerals
Product Testing
Mechanical/Metallurgical Testing
Calibration Services
Chemistry Lab
Consulting Geology
Construction Materials Laboratories
Mineral Aggregates
Concrete
Stone & Masonry
Asphalt
Radon Reference Lab
Schedule Monitor Calibration
Schedule a Performance/Proficiency Test
Schedule Spiking
Schedule Calibration and Performance/Proficiency Test
Projects
Resources
Blog
Articles
Events
About
Locations
People
Testimonials
Engineering & Environmental Services
Geotechnical Engineering
Design Phase Services
Facility Management Services
Forensic Services
Civil Engineering
Waste Management Facilities
Water Resources
Drone Mapping & Photogrammetry
Environmental Services
Due Diligence
NEPA Compliance
NPDES Permitting and Monitoring
USACE 404/401 Permitting
Site Remediation
Regulatory Compliance Services
Groundwater Modeling & Monitoring
Brownfield Services
Indoor Air Quality
Construction Support Services
General Construction
Construction Quality Assurance
Building Code Special Inspections
Transportation
Materials Consulting
Construction Engineering
Concrete Consulting
Laboratory Services
Geotechnical Laboratories
Analytical Services Laboratories
Industrial Minerals
Product Testing
Mechanical/Metallurgical Testing
Calibration Services
Chemistry Lab
Consulting Geology
Construction Materials Laboratories
Mineral Aggregates
Concrete
Stone & Masonry
Asphalt
Radon Reference Lab
Schedule Monitor Calibration
Schedule a Performance/Proficiency Test
Schedule Spiking
Schedule Calibration and Performance/Proficiency Test
Projects
Resources
Blog
Articles
Events
About
Locations
People
Testimonials
Blog
Filter by:
View All
Categories
Analytical Services
Construction Materials Testing
Engineering
Environmental
General
Radon
01.12.18 |
Katherine Beach
Phase I ESAs: Taking the Scenic Route Through Greene County, Ohio
As with most American families, my holidays are steeped in tradition. One of my favorite Thanksgiving traditions is to put the turkey in the oven and then go out for a bike ride. This year’s ride brought back memories of a series of intense Phase I Environmental Site Assessments (ESAs) that I participated in during 1989 - 1990. These projects were conducted for Greene County Recreation and Parks District and were noted for their national significance under the Federal Highway Transportation Bill. Bowser-Morner, Inc. (BMI) completed Phase I ESAs on the H-Connector and the Little Miami Scenic Trail.
Read More
Tags:
Due Diligence
,
Environmental
This site uses cookies to ensure you have the best experience and to analyze our traffic. Read more in our
Privacy Policy
.
{1}
##LOC[OK]##
{1}
##LOC[OK]##
##LOC[Cancel]##
{1}
##LOC[OK]##
##LOC[Cancel]##